Envent attends the CTAC Committee meeting in Washington DC on May 7 & 8. The end result of this meeting was the attached Policy Letter from the United States Coast Guard on the Safe Operation of Mobile Vapor Control Systems. The USCG provided the attached Policy Letter clarifying that CFR 154 safety equipment, shutdowns and controls requirements will not be replaced by a man standing nearby ready to push the mushroom as some competitors seem to have been hawking. Customers now have the piece of mind and clear guidance that the USCG wants things done safely. Envent will provide that safety system in our prepacked Envent EMECS and Envent Dock Safety Unit (DSU).
[wpfilebase tag=file id=268 tpl=’dload_button_nocount’ /]