An Illinois refinery required a 169,000-barrel overflow tank to be degassed. Estimated to have saved $250,000 by contracting Envent.
- All
- /Case Studies
- /Compression
- /Degassing
- /GHG Emission Control
- /Marine Vapor Recovery
- /Mobile Water Treatment
- /Odor Control
- /Soil Vapor Extraction and Remediation Systems
- /Turnaround Services
- /Vapor Control
- /Vapor Scrubbing
-
-
Houston, Refinery Turnaround Support Services
Project: Turnaround Support Services. Cost Savings: $150,000. Location: Gulf Coast Refinery.
-
New Jersey, Refinery Water Treatment
A refinery requested to do on-site wastewater treatment for a 2,000,000 gallon tank.. Savings of $170,000 was estimated when compared to the transportation and off-site treatment costs.
-
Port Arthur, TX, Chemical Plant Benzene Tank Degassing
A chemical plant in Texas required a 24,000 barrel tank to be degassed during, and following a tank cleaning. Degassing Tanks under a Nitrogen Blanket Not a Problem for Envent.
-
Cedar Bayou, TX, Water Filtration & Discharge Project
A Houston-based chemical company had consistent issues with high amounts of suspended solids in their storm water. Removed 90% of the solids which enabled the treatment facility to perform more efficiently.
-
Pennsylvania Refinery, Pipeline Degassing
During a pipeline re-commissioning a leak was detected requiring 12,000 barrels of propane needing to be combusted. By using the vapors in two ways, the time to depressure the pipeline was completed 4 times as fast.
-
Torrance, California Refinery Emergency Turnaround Support
A refinery’s primary flare for the onsite tank farm was being taken offline for emergency maintenance. Envent provided a thermal oxidizer capable of destroying vapors during this maintenance period. Client continued tank farm operations during the turnaround without shutting down.
-
San Francisco, Gasoline Barge Degassing
An energy and industrial services company needed to degas 10 compartments barge in California. Quick and effectively was required. Envent degassed each compartment in 2 hours, with a 99.9% destruction efficiency.
-
Kentucky Refinery, Emergency Tank Degas
A tank farm customer requested Envent be onsite for an unscheduled tank refill within 4 hours. Envent was able to respond to the emergency quickly and safely, which saved the customer thousands of dollars in down time.
-
San Francisco, Marine Terminal Barge Degas
Project: Marine Loading Vapor Control. Cost Savings: $147,000. Location: West Coast Terminal. Product: High Octane Naphtha. Saved client approximately $147,000 by contracting Envent as the mobile vapor control provider.
-
Louisiana Refinery, H2S & Sulfur Dioxide (SO2) Vapor Scrubber
Project: Sulfur Dioxide Vapor Scrubber. Location: Beaumont, Texas. Product: Sulfuric Acid. Result: 100% vapor abatement while allowing operations to commence undisturbed.
-
Central California Dewatering and Treatment for Soil Excavation
A customer at a Super Fund Site in Central California needed support to dewater a pit dug in a neighborhood in order to remove contaminated soil. Cost of treating and discharging the water was at a fraction of the cost.