Challenge A gulf coast refinery was recently the target of a large hurricane: a storm that caused them significant damages. It was at this point, the refinery decided to change their model from a refinery into a storage terminal facility. During this process, the facility found value in selling their current product via marine vessels. […]
- All
- /Case Studies
- /Compression
- /Degassing
- /GHG Emission Control
- /Marine Vapor Recovery
- /Mobile Water Treatment
- /Odor Control
- /Soil Vapor Extraction and Remediation Systems
- /Turnaround Services
- /Vapor Control
- /Vapor Scrubbing
-
-
Liquid Natural Gas (LNG) Bunkering
Challenge A customer of ours has two cargo ships that constantly transfer cargo up and down the west coast. These ships are always sailing back or forth with commerce and are on extremely tight schedules. Envent Corporation was challenged with assisting in the commissioning a new LNG fuel system on one of these cargo ships, […]
-
Northern California, Mobile Water Treatment – Multi Phase Extraction
Challenge Contaminated water at a Northern California Refinery where groundwater must be extracted before it enters the bay. There is a series of groundwater wells and pumps that maintain hydraulic control of the area’s sub surface water system and prevent the contaminated water from reaching the Bay. The source of contamination was a Methyl tert-butyl […]
-
Envent helps in overcoming local Environmental regulations
A large North East Oil and Gas customer needed to perform much-needed maintenance of degassing and tank cleaning on one of their Crude Oil tanks. High odor concern, public safety, scrutinized media attention required a solution by Envent Corporation that was fast, odor free, safe to neighbors, and in compliance with local regulations.
-
West Texas Terminal – 3 Tank Vapor Control
Challenge A large Oil and Gas customer needed to perform maintenance on 3 tanks in one of their West Texas terminals. The majority of the maintenance was focused on removing and replacing the shell-side mixers. The problem was that those same tanks were critical to their day to day operations, meaning that the turnaround time […]
-
Depressurization of a Panhandle LPG Pipeline
Challenge Envent was challenged with depressurizing a propane line, within the confines of a gulf coast refinery. The line measured over 2 miles, was above 200 psig, and was full of liquid propane gas. Envent needed to ensure the pipeline was cleared and ready for Hotwork within a 2 day time frame due to inclement […]
-
California Refinery Barge Loading
Challenge A California refinery had a need to load gasoline, ethanol, and other high vapor pressure materials (classified as MVR products) onto barges. MVR products are required to have vapor control on them during transfer onto the vessel. The loading terminal is not equipped with any form of vapor recovery device on the dock. Without […]
-
Port Arthur Refinery – H2S Scrubber Control
Challenge A customer was facing EPA fines in the tens of thousands of dollars per day for the release of H2S and VOC’s to atmosphere from a tank not permitted to contain H2S-laden material. The customer reached out to Envent to solve the problem within a short deadline of three months. Solution Envent was […]
-
RTO Breakdown Emergency Mobile Replacement
West Coast customer challenged Envent to create an immediate temporary solution which would enable them to continue production during the 1.5 month lead time it would take to manufacture, transport, and install their new system.
-
Golden Triangle Refinery Turnaround
An 80,000 bbl. /day crude distillation unit underwent a month long planned shutdown in order to perform maintenance on their exchangers, and pressure vessels.
-
Gasoline Product Pipeline Degassing
A West Coast oil company needed to purge 20 miles of pipeline with crude and hydrogen sulfide vapors. The oil company needed a solution to vapor degas this large volume of crude and H2S vapor from this pipeline to allow pipeline repairs.
-
Mid-West, USCG Certified Marine Vapor Recovery System
A Mid-West refinery was preparing for an internal pipeline maintenance project and was exploring options for how to take the vent and a refined product pipeline out of service to sustain refinery production and continue to ship refined project to market…
- « Previous
- 1
- 2
- 3
- 4
- Next »