Challenge A refinery sulfur recovery loading rack was giving off foul/hazardous odors to truck drivers and personnel located in immediate surrounding area of sulfur recovery unit (SRU) during truck loading events. Truck drivers inside the refinery were required to dawn SCBA’s and load trucks with truck dome hatches open. They had to visually […]
- All
- /Case Studies
- /Compression
- /Degassing
- /GHG Emission Control
- /Marine Vapor Recovery
- /Mobile Water Treatment
- /Odor Control
- /Soil Vapor Extraction and Remediation Systems
- /Turnaround Services
- /Vapor Control
- /Vapor Scrubbing
-
-
Port Arthur Refinery – H2S Scrubber Control
Challenge A customer was facing EPA fines in the tens of thousands of dollars per day for the release of H2S and VOC’s to atmosphere from a tank not permitted to contain H2S-laden material. The customer reached out to Envent to solve the problem within a short deadline of three months. Solution Envent was […]
-
Mid-West, USCG Certified Marine Vapor Recovery System
A Mid-West refinery was preparing for an internal pipeline maintenance project and was exploring options for how to take the vent and a refined product pipeline out of service to sustain refinery production and continue to ship refined project to market…
-
Emergency Vapor Scrubbing – Southern California Refinery
Challenge A refinery in Southern California experienced severe plugging in a section of piping downstream of their coker unit. In order to eliminate the restriction, the refinery needed to perform a line break and attempt to clear the line. The column attached to the line contained high concentrations (2500 ppm) of ammonia vapors and the […]
-
Port Arthur Refinery, Flareless Hydrocracker Turnaround
Port Arthur refinery customer had to complete a flareless turnaround involving their Hydrocracker Unit. Envent mobilized three EMECS-42 thermal oxidizers, two ESCRUB-6000 recirculating scrubbers, and all associated safety equipment to complete the decommissioning.
-
Southern California, Vapor Control
Reducing fugitive emissions from the top lid of an old oil recovery unit DAF Cell. Leak Detection And Repair (LDAR) is being taken very seriously in more and more areas of the country. This facility’s oil recovery cells were becoming aged and so the facility wanted to take proactive measures to ensure that no fugitive emissions would escape through the lids.
-
Texas City, Texas, Sulfur Loading
VapoScrub™H2S yielded the best and most economical option giving a total cost saving of $200,000 over the duration of the project.
-
North Dakota, Frac Tank Vapor Control
A petroleum manufacturer contracted Envent to do vapor control on a series of frac tanks being filled with shale oil from a pipeline. Envent provided vapor control systems for each set of 15 frac tanks.
-
Port Arthur, Texas, Liquid Ring – High Volume, Vacuum Truck Vapor Control
Port Arthur refinery needed to abate vapors following a super sucker vacuum truck (3000 CFM) containing high concentrations of H2S and residual VOCs. The cost savings versus carbon was estimated to be $100,000.
-
Houston, Texas, Pipeline Blowdown
Houston oil pipeline company was clearing 25 miles of 16 in pipe into a crude tank. The oil had an API of 12˚. The company needed the line cleared soon as possible. Envent completed the job with an efficiency of greater than 98% and an estimated cost savings over carbon of $30,000.
-
Sludge Processing / Tank Cleaning Vapor Control
A refinery contracted Envent to use our EVAC 1000 unit to do temporary odor and vapor control for its sludge processing centrifuge operations. Envent was able to make the GAC last approximately 3 times longer savings the customer approximately $150,000.
-
West Coast Refinery, Vapor Control on Arabian Crude Tank
A refinery company on the West Coast needed to de-inventory a tank of Arabian Crude with unexpectedly high hydrogen sulfide levels. After receiving multiple odor complaints from within the refinery and one odor complaint from the public, the client knew they needed to resolve the issue immediately. Due to Envent’s immediate mobilization for the project, the client saved at least $100,000.
- « Previous
- 1
- 2
- 3
- Next »